Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
3 changes: 3 additions & 0 deletions inputs/manual_input.csv
Original file line number Diff line number Diff line change
Expand Up @@ -623,3 +623,6 @@ H2 production biomass gasification CC,VOM,2020,0.46,EUR/MWh_H2,2010,"JRC, 01_JRC
grey methanol synthesis,efficiency,2030,0.569,MWh_MeOH/MWh_gas,2020,"From https://www.sciencedirect.com/science/article/pii/S0016236119311767, table 2, Methanol Synthesis with integrated autothermal reforming. Efficiency is the exergetic efficiency ",
grey methanol synthesis,carbondioxide-output,2030,0.0567742,t_CO2/MWh_gas,2020,"Calculated from the carbon content of gas (0.198 t_CO2/MWh) compared to the carbon content of MeOH (0.2482 t_CO2/MWh)",
grey methanol synthesis,investment,2030,1001188,EUR/MW_MeOH,2020,"Calculated from https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2021/Jan/IRENA_Innovation_Renewable_Methanol_2021.pdf) Table 25 with an exchange rate of 0.8775 EUR/USD and energy content of 5.528 MWh_MeOH/t_MeOH",
Afforestation,lifetime,2025,30,years,-,"https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515",
Afforestation,FOM,2025,5,%/year,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515",
Afforestation,investment,2025,7749,EUR/ha,2020,"https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515",
3 changes: 3 additions & 0 deletions outputs/US/costs_2020.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2025.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2030.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2035.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2040.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2045.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/US/costs_2050.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year,financial_case,scenario
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0,,
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,,,
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,Market,Moderate
Alkaline electrolyzer large size,FOM,4.0,%/year,ICCT IRA e-fuels assumptions ,Meaning of scenario and financial case: https://atb.nrel.gov/electricity/2024/definitions#scenarios,2022.0,R&D,Conservative
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2020.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,6.4,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.6142,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.5,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2025.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,4.6,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2030.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2035.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2040.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2045.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down
3 changes: 3 additions & 0 deletions outputs/costs_2050.csv
Original file line number Diff line number Diff line change
@@ -1,4 +1,7 @@
technology,parameter,value,unit,source,further description,currency_year
Afforestation,FOM,5.0,%/year,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,investment,7749.0,EUR/ha,https://onlinelibrary.wiley.com/doi/epdf/10.1111/rec.13515,,2020.0
Afforestation,lifetime,30.0,years,https://onlinelibrary.wiley.com/doi/full/10.1111/rec.13515,,
Alkaline electrolyzer large size,FOM,2.8,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,VOM,0.2389,EUR/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,2010.0
Alkaline electrolyzer large size,electricity-input,1.38,MWh_el/MWh_H2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_15_TECHS_HYDROGEN.xlsx` (SELCH2EC01, H2 Production-Alkaline Electrolyser, large size, centralized) and currency year from file `SubRES_15_TECHS_HYDROGEN.xlsx`, Sheet `INPUT-Data(HP)`",Reference capacity 72 MW,
Expand Down